![TRAIT UNION 4 https://echame.fr/wp-content/uploads/2023/07/TRAIT-UNION-4-640x640.jpg](https://echame.fr/wp-content/plugins/bold-page-builder/img/blank.gif)
![TRAIT UNION 3 https://echame.fr/wp-content/uploads/2023/07/TRAIT-UNION-3-640x640.jpg](https://echame.fr/wp-content/plugins/bold-page-builder/img/blank.gif)
![TRAIT UNION 2 https://echame.fr/wp-content/uploads/2023/07/TRAIT-UNION-2-640x640.jpg](https://echame.fr/wp-content/plugins/bold-page-builder/img/blank.gif)
Site : Restructuring an office building with radiant ceilings. Our activated ceilings are combined with a hot or cold water circulation system in copper pipes inside the tanks. This activation makes it possible to heat or cool depending on the season, and represents a major step forward in terms of energy savings and respect for the environment.
Installation company : AGP
Product installed : ILOT J suspended islands, copper activation and acoustic padding